Fest Ghana Limited Case Study Portfolio 2026 — Real Ghanaian Waterproofing Projects

Fest Ghana Limited — Case Study Portfolio 2026

These are real projects, real materials, real outcomes. No stock photos. No exaggerated claims. Every case study below documents an actual Fest Ghana Limited installation on a Ghanaian building — the diagnosis, the specification, the application, and the result.

This portfolio is designed for architects, engineers, quantity surveyors, contractors, real estate developers, facility managers, and procurement officers evaluating Fest Ghana Limited for institutional, commercial, or government projects. Use these case studies as reference for your own project planning.

The Three Numbers, Stated Plainly

Before the projects, the specification. These figures apply to every job in this portfolio and do not vary:

Term Fest Ghana Limited Contractual meaning
Workmanship warranty 3 years We return and remedy defective installation at our cost
Manufacturer material warranty 3 years Defective coating replaced free of charge
Design life 20 years Engineered service life, correctly installed and maintained. Not a warranty.

We state these separately because the distinction matters at tender stage. A bid quoting a "20-year warranty" on waterproofing is quoting design life. No coating manufacturer operating in Ghana underwrites a 20-year warranty, and no contractor can honour one. If a competing tender shows a warranty longer than 3–5 years, ask for the underwriting document.

Portfolio Overview

Projects documented in this portfolio:

  • 8 detailed case studies with photos, materials, and results
  • Coverage across Accra, Tema, Kumasi, Madina, Tantra Hill, Kasoa, and Kpone Katamanso
  • Systems including polyurethane, fleece-reinforced membrane, and specialty applications
  • Building types: residential, commercial, industrial, agricultural, filling station, and public building

Case Study 1: Concrete Roof & Wall Waterproofing — Kpone Katamanso

Project: Comprehensive residential waterproofing on a home in Kpone Katamanso, opposite DPS International (Delhi Public School International).

Diagnosis: Homeowner wanted proactive protection of entire building envelope before serious rainy-season damage developed.

Solution: Full concrete roof + exterior wall waterproofing with single-component polyurethane liquid membrane (2-coat application). Continuous membrane transition from roof to walls treated as most critical detail.

Materials: 15 × 10kg buckets of polyurethane = 150 kg total, over 370 m².

Verified material rate: 150 kg over 370 m² at two coats = 0.41 kg/m², or roughly 24 m² of finished two-coat membrane per 10kg bucket. QSs can use this figure directly for take-off on similar substrates.

Result: 370 m² total surface waterproofed in 3 days. 20-year design life. 3-year workmanship warranty.

🎥 Video available: Watch the project on YouTube

👉 Read the full Kpone Katamanso case study

Case Study 2: Reinforced Parapet Waterproofing — Madina, Accra

Project: Failing parapet wall on a residential building in Madina causing repeated internal water damage on top-floor units.

Diagnosis: Original parapet upstand only 100 mm high, no fleece reinforcement at internal corner, hairline cracks from thermal cycling.

Solution: Removed failed coating, applied primer, installed fleece-reinforced polyurethane membrane with proper upstand detail.

Result: Zero leaks through two full rainy seasons. 20-year design life.

👉 Read the full Madina case study

Case Study 3: Concrete Gutter Waterproofing — Tema Community 10

Project: Leaking concrete rooftop gutter causing intermittent water penetration into ground-floor commercial space.

Diagnosis: Multiple failed patch repairs over 8 years. Underlying concrete substrate cracked. Original waterproofing paint had degraded.

Solution: Full gutter strip and rebuild. Applied polyurethane coating with fleece reinforcement at all corners and outlets.

Result: 20-year design life. Fest Ghana Limited maintenance contract in place for annual inspection.

👉 Read the full Tema Community 10 case study

Case Study 4: Sump Pit Waterproofing — Kasoa Filling Station

Project: Groundwater ingress into fuel dispenser sump pits at an active filling station, threatening fuel contamination and NPA compliance.

Diagnosis: High water table (Kasoa location), original waterproofing failed at construction joints, hydrostatic pressure exceeding coating capability.

Solution: Negative-side waterproofing with crystalline cementitious system + polyurethane top-coat. Waterstops installed at all joints.

Result: Pits sealed against groundwater. NPA compliance maintained. Zero downtime during application.

👉 Read the full Kasoa filling station case study

Case Study 5: Concrete Floor Slab Waterproofing — Tantra Hill, Accra

Project: Waterproofing of a large flat concrete floor slab on a new residential property in Tantra Hill, North Accra.

Diagnosis: New-build concrete slab requiring protection before rainy season. Concrete is porous — an uncoated slab passes water regardless of thickness.

Solution: Two-coat polyurethane liquid membrane, applied in perpendicular directions. Crack filling and butyl tape at all penetrations.

Materials: 14 × 10kg buckets = 140 kg.

Result: 20-year design life. Warranty transferred to owner at completion.

👉 Read the full Tantra Hill case study

Case Study 6: Metal Roof Gutter — Fleece-Reinforced Membrane Installation

Project: Metal box gutter on IBR roof system in Greater Accra. Multiple leak points along gutter length.

Diagnosis: Bitumen tape patches had cracked. Silicone sealant had failed. Underlying metal showing early corrosion.

Solution: Cleaned and treated metal. Applied fleece-reinforced polyurethane membrane across entire gutter length with proper transitions.

Result: Fully sealed gutter and structural protection of the metal substrate. Note that service life on a metal gutter is governed by the condition of the metal beneath, not by the membrane — the 20-year design life applies to the coating, not to corroded steel.

👉 Read the full metal gutter case study

Case Study 7: Fish Pond Waterproofing — Ghana Aquaculture Project

Project: Tile-lined concrete fish pond leaking, threatening aquaculture operation.

Diagnosis: Tile grout joints failed. Concrete substrate had hairline cracks from ground movement.

Solution: Removed tiles. Sealed cracks. Applied fish-safe polyurethane coating rated for potable water contact. Re-tiled.

Result: Pond returned to service. 20-year design life. Aquaculture operation resumed within 2 weeks.

👉 Read the full fish pond case study

Case Study 8: Standard Concrete Roof Protection System

Reference: This case study documents Fest Ghana Limited's standard concrete roof protection system, with performance data from installations across Accra.

System: Two-coat polyurethane liquid membrane on primed concrete substrate. Fleece reinforcement at all penetrations, corners, and drainage outlets. Reflective top-coat for UV protection.

Result: 20-year design life, backed by a 3-year manufacturer material warranty and a 3-year Fest Ghana workmanship warranty. Reference installations available for site visits by prospective clients.

👉 Read the standard system case study

Sector Coverage Summary

Sector Project Example Location
Residential (comprehensive envelope) Concrete roof + wall waterproofing (370 m²) Kpone Katamanso (opposite DPS International)
Residential (mid-density) Parapet waterproofing Madina, Accra
Residential (concrete floor slab) Floor slab waterproofing (140 kg) Tantra Hill, Accra
Commercial (mixed-use) Concrete gutter Tema Community 10
Filling station / Fuel Sump pit waterproofing Kasoa
Industrial (IBR roofs) Metal gutter fleece-reinforced Greater Accra
Agricultural / Aquaculture Fish pond sealing Ghana

Additional Sectors We Serve (Not Yet in Documented Portfolio)

What Sets Fest Ghana Limited Apart

  • Systems built for Ghana's climate — UV, humidity, thermal cycling, rainy season
  • Fleece-reinforced installation option — protects the corners, upstands and penetrations where membranes actually fail, so the system is far more likely to reach its design life
  • Written warranties — 3-year workmanship + 3-year manufacturer material, transferable
  • Honest specification — we quote warranty and design life as separate figures, in writing
  • Insurance-backed — public liability + professional indemnity
  • GSA-compliant materials — approved for government tenders
  • Nationwide service — Accra, Tema, Kumasi, Takoradi, Cape Coast, Ho, Tamale, Sunyani, Kasoa, Kpone Katamanso
  • PPM contracts available — keep warranties valid and buildings dry long-term

Working With Fest Ghana Limited — The Process

  1. Free site assessment — our technicians visit, diagnose the actual problem
  2. Written fixed-price quote — no hidden extras, materials and labour itemised
  3. Scheduled installation — typically within 3–7 days of quote acceptance
  4. Application per specification — with photo documentation at each stage
  5. Flood test — verified before handover
  6. Written warranty issued — 3-year workmanship + 3-year manufacturer material
  7. Ongoing maintenance — optional PPM contract for annual inspection and touch-ups

Request the Full Portfolio Document

For institutional buyers, procurement officers, and technical evaluators, Fest Ghana Limited can supply:

  • Detailed PDF case study portfolio
  • References from named client contacts (with permission)
  • Site visit arrangements to completed projects
  • Technical specifications and product data sheets
  • Insurance certificates and GSA compliance documentation
  • Warranty templates for legal review

👉 Request Full Portfolio Package · Call/WhatsApp: 0555 548 001 · Email: festghanalimited@gmail.com